Atlas Adhesives

Turf Glue N-TURF 19
Synthetic
Grass Bond

Two-component, solvent-free polyurethane adhesive engineered for high-performance synthetic grass sports surfaces. Permanent adhesion. All-weather reliability.

Solvent Free Two Component PU High Bond Strength All-Weather Performance ISO 9001:2015 Certified Indoor & Outdoor Permanently Elastic Professional Sports Grade Solvent Free Two Component PU High Bond Strength All-Weather Performance ISO 9001:2015 Certified Indoor & Outdoor Permanently Elastic Professional Sports Grade

The Seam
Bond Test

N-Turf-19 creates bonds stronger than the turf backing itself. Drag the scrubber to simulate increasing pull force — watch what breaks first and why installers trust this adhesive on every seam.

Verified Performance Data
Turf backing failure point ~80–90 N
N-Turf-19 peel resistance >100 N
After 14-day soak at 70°C >100 N ✓
SEAM PULL FORCE SIMULATOR
🌱 Synthetic Turf — Sports Grade Backing
N-TURF-19 ADHESIVE
SEAMING TAPE
Sub-base / Substrate
0 N
↔ Drag scrubber to apply force
0N 150N
READY ⏸
0
Applied (N)
Seam Status
Failure Point

The Turf Bond
Layer System

Click each layer to inspect material properties and how N-Turf-19 works across the complete seaming system.

L01
Synthetic Turf Surface
Sports-grade artificial grass fibres
Top
L02
N-Turf-19 Adhesive
9:1 ratio — applied via notched trowel
~2mm
L03
Seaming / Joining Tape
30cm or 40cm width carrier
~1mm
L04
Sub-base Substrate
Concrete, compacted gravel or hardboard
Base
↑ Click any layer to inspect properties
Layer 01 / Top Surface
Synthetic Turf Surface
Professional-grade artificial grass installed over the seaming system. N-Turf-19 bonds turf edges permanently — the adhesive bond exceeds the turf backing strength, ensuring clean, invisible seams on any sports surface.
Sports Grade
Turf Type
In/Outdoor
Application
All Carpets
Compatible

Application
Instructions

01
Surface Prep
Dust, dirt and oil free surface required. Do not apply on wet substrates. Avoid water contact for 8–10 hours post-application.
02
Mix 9:1
Pour all of Component B into Component A. Mix at low speed until smooth. Pre-dosed — never mix partial quantities.
03
Trowel Apply
Apply via notched trowel onto seaming tape. Ensure clean trowel notches. Use all mixed material within the pot life window.
04
Cure & Service
Pot life 30–60 min at 25°C. Fully service-ready in approximately 5 days under standard conditions.

Why Choose
N-Turf-19

Bond Stronger Than the Material
Once cured, creates bonds stronger than the turf backing itself. Peel resistance exceeds 100N even after 14-day thermal soak.
🌿
Zero Solvents, Zero Odour
100% solids formula — no harmful vapours. Safe for enclosed stadiums and indoor installations with no ventilation concerns.
All-Weather Durability
Heat and weather resistant PU. Designed for year-round outdoor performance in all climate conditions.
🔄
Permanently Elastic
Remains elastic after curing — absorbs substrate movement and thermal stress without delaminating over time.
🎯
Universal Carpet Bonding
Bonds all carpet and tape combinations — indoor and outdoor rolls of any synthetic turf specification.
🏟️
Sports Grade Engineering
Specifically developed for synthetic grass sports surfaces requiring high elastic-mechanical performance properties.

Approved
Applications

Application 01
Professional Sports Fields
Football · Hockey · Rugby · Multi-Sport
Professional Sports Fields
N-Turf-19 is the specification adhesive for bonding artificial grass on professional sports surfaces where seam failure is never an option. Used by installers across India for FIFA, FIH, and World Rugby certified surfaces.
>100N
Peel Resistance
≈5 days
Full Cure
All Sports
Surface Grade
Application 02
Synthetic Turf Seaming
Indoor & Outdoor · 30cm & 40cm Tape
Synthetic Turf Seaming
Jointing and seaming turf rolls indoors and outdoors. Applied via notched trowel onto seaming tape — creating elastic, high-strength, invisible joints. Works with any roll and tape combination.
0.4–0.5 kg
Per m (40cm)
0.3–0.4 kg
Per m (30cm)
Trowel
Method
Application 03
Rubber Sheet Bonding
Concrete · Hardboard · Chipboard
Rubber Sheet Bonding
Bonds rubber sheets to concrete, hardboard, and chipboard. Tolerates slightly moist substrates. Not suitable for PE, PP, or PTFE — always perform test bonding before large-scale application.
Concrete
Primary Sub.
Moist OK
Tolerance
No PE/PP
Exclusions
Application 04
Prefabricated Mat Systems
High-Performance Mat Surfaces
Mat Systems
Bonding high-performance prefabricated mat sports surfaces. Higher consumption than seaming — substrate type significantly affects quantity. Always verify with a test area first.
1–2 kg
Per m²
Varies
By Substrate
High Perf.
Mat Grade

Pot Life
by Temperature

Select your site temperature to see your working window before mixing — critical for planning material logistics on hot days.

00:00
Elapsed Time
Safe   Caution   Expired
Select Site Temperature
Mix60 min

System
Specifications

#PropertiesResult
1ComponentTwo Component Thixotropic PU
2Coverage2,000 – 3,000 g/m²
3ColourGreen
4Viscosity8,000 – 17,000 mPas
5Density (25°C)(A) 1.60 ± 0.05 g/cm³ | (B) 1.20 ± 0.01 g/cm³
6Solids Content100% (A+B combined)
7Consistency(A) Thick paste | (B) Liquid
8Mixing Ratio9:1 (A:B by weight)
9Pot Life @ 25°C30 – 60 Minutes
10Application Temperature0°C to +30°C
11Open Time~60 Minutes
12Ready for Service~5 Days
13Peel Resistance>100 N after 4 days at +23°C & 14-day soak at +70°C

Project
Calculator

Instant adhesive quantity estimates. Switch between seaming and mat bonding — enter your dimensions and get bucket counts in seconds.

Substrate Compatibility
🪨
Concrete
✓ Compatible
🪵
Hardboard
✓ Compatible
🏗️
Chipboard
✓ Compatible
💧
Slightly Moist
✓ OK
🚫
PE / PP
✗ Not OK
🚫
PTFE
✗ Not OK
Adhesive Calculator
Real-time quantity estimates for your installation
4.0
kg
Minimum
5.0
kg
Maximum
1
×15kg
Buckets
Estimates only. Contact our team for certified project specifications.

Packaging &
Storage

📦
Packaging
Unit Size15 kg Bucket
Component A (Resin)13.5 kg
Component B (Hardener)1.5 kg
Mix Ratio9:1 (A:B)
ColourGreen
🌡️
Storage Conditions
Storage Temperature5°C – 30°C
Shelf Life12 Months
Component B Min.Above +5°C
Min Application Temp0°C
Max Application Temp+30°C

Application
& Guide

At temperatures above +35°C, open time may be significantly reduced — plan material usage and logistics accordingly.
Store Component B above +5°C to ensure optimal product performance upon mixing and application.
Only mix whole pre-dosed contents. Partial quantities risk incorrect dosing — components must be weighed very accurately if splitting.
Do not apply below 0°C — bonding performance will be compromised at sub-zero temperatures.
Clean equipment with warm water while still wet. Once hardened, adhesive can only be removed mechanically.
Always test-bond individual substrates prior to any large-scale application — never skip the test bonding step.

Specify N-Turf-19
for Your Project

Build your athletic surface with confidence — our engineering team provides expert consultation, substrate verification, and certified IAAF documentation support.

Call: 97161 11197 ↓ Download TDS